One team for the design, the selections and the build.
New layout, cabinetry, counters, lighting and appliances, walls moved when needed.
New finishes in the existing footprint for a faster, lower-cost update.
Walk-in showers, freestanding tubs, double vanities and heated floors.
Tile, vanity and fixture updates on a short schedule.
Inset, frameless or painted cabinets built to your measurements.
Curbless showers, grab bars and wider doors that still look beautiful.
Four steps, one project manager.
Meet a designer at the showroom or at home. Talk about how you use the room and what is not working.
Drawings, 3D views, every selection in writing and one fixed price before demolition.
One project manager, dust walls, a weekly schedule update and a clean site every evening.
We finish the punch list together, then you get a two-year workmanship warranty in writing.
Every home is different, so your fixed price comes after design.
| Project | Typical range | Time on site |
|---|---|---|
| Full kitchen remodel | $55,000 to $95,000 | 9 to 13 weeks |
| Kitchen refresh | $28,000 to $45,000 | 5 to 7 weeks |
| Primary bathroom | $32,000 to $55,000 | 6 to 9 weeks |
| Guest bathroom | $14,000 to $24,000 | 3 to 5 weeks |
Sample figures for this demonstration site.
No. Many clients bring their own tile or fixtures. We price the labor either way.
The first consult is free. The design phase is a flat fee that is credited back to your build if you go ahead.
Yes. Two years on our workmanship in writing, plus every manufacturer warranty on products.
We will talk through what you want, what it costs and how long it takes, with no pressure to sign.